Getting Started



                              Purge Unit & Enclosure Connection Requirements

     1.  No valves shall be installed between the Pressurization/  5.  Multiple Protected Enclosures must be purged in series
        Purge Unit and the Protected Enclosure.                 and should be connected from the smallest to the largest
     2.  The Pressurization/Purge Unit should be located at eye   enclosure.
        level.                                              6.  Enclosure Supply connections between multiple
     3.  The Pressurization/Purge Unit should be installed      enclosures must be at least the diameter of the Purge
        adjacent to the protected enclosure.                    vent exhaust (3/4”).
     4.  Enclosure Supply and Purge Vent should be installed
        at extreme opposite corners, to ensure adequate purge
        flow through the Protected Enclosure.



                                         Single Enclosure Connections




                                                                                            Purge Vent
              1” Protective Gas                                                             Model # PV-2
               Supply Header
                                                                 Enclosure Reference
                                                                    1/4” Tubing


                                                                                       Protected
                               Unit Supply                                             Enclosure
                               1/4” Tubing
                                                  Purge
                                                   Unit

                                                               Enclosure Supply
                                                                 1/4” Tubing





                                        Multiple Enclosure Connections





     1” Protective                                                                                      Purge Vent
     Gas Supply                                                                                        Model # PV-2
      Header                                                Enclosure Reference
                                                                1/4” Tubing


                                                                                                   Protected
                 Unit Supply                        Protected             Protected                Enclosure
                 1/4” Tubing      Purge             Enclosure             Enclosure                   #3
                                   Unit                #1                   #2



                                     Enclosure Supply                 Multiple Enclosure Supply
                                       1/4” Tubing                        3/4” Rigid Pipe