Page 8 - F10-BPS-YZ101B-Installation-Manual
P. 8

Pressurization Unit & Switch Set Up



                Pressurization Unit Set Up                               Pressure Switch Set Up

     1.  Ensure Protected Enclosure Power is OFF, Enclosure   1.  The following directions are for purge models with the
        Pressure Control Regulator is closed and Protective     suffix -W or -B which are supplied with a flame proof
        Gas Supply is ON.                                       differential pressure switch (DPS).
     2.  Adjust Redundant Regulator, if utilized, to 5 psi maximum         IMPORTANT NOTE
        or skip to step 3 if enclosure is equipped with a Model
        PV-3 Purge Vent.                                     The differential pressure switch is intended solely for loss
     3.  Test Purge Vent, if utilized. Using the eraser end of a   of safe pressure alarm and should not be used to control
        pencil or similar object, insert from inside the enclosure   power to the protected enclosure.
        to confirm vent relief ball is operating properly. Note:
        Side mounted, Model PV-3-S, remove plug from bottom   2.  Connect alarm system wiring to the DPS via rigid
        of tee fitting to test vent.                            conduit and seal or other approved wiring method for
     4.  Close and Seal Protected Enclosure.                    the classified location.

     5.  Slowly turn Enclosure Pressure Control Regulator   3.  The DPS provides a Form C Dry NO, NC and C contact.
        CW until a “Safe” 0.5” w.c. reading is shown on the      Note: -B switches require 120 VAC or 24 VDC power to
        Enclosure Pressure Gauge. Note: If unable to achieve a   operate.
        “ Safe” enclosure pressure, carefully check all enclosure   4.  The alarm system should be connected in a fail safe
        connections and doors for leakage. Seal as needed.      configuration.
     6.  Class I, confirm and document Protective Gas flow shown
        on temporarily installed flow meter. Use formulas below
        to determine purge time required, 5 minutes minimum.
        (Total Enclosure Volume x 4)/Flow Rate                 Typical Pressure Switch Wiring Diagram
        (Total Enclosure Volume x 5)/Flow Rate
     7.  Mark purge time on Unit start up instruction name tag              C         NO         NC
        using a permanent marker.
     8.  Set up is complete. Remove any test equipment and
        proceed to Optional Enclosure Pressure Switch Set up
        if required.







                                                                            Customer Supplied Alarm



                                            Cross Ventilation Diagram


                                                                                                         (optional)
        Protective                                                                                      Purge Vent
       Gas Supply
         Header                                        Enclosure Reference Tubing



                                                                          Protected
                                                    Protected            Enclosure(s)
                                                   Enclosure(s)
                                Purge                                                           Protected
                                Unit                                                           Enclosure(s)
           Unit Supply Tubing







     Page 8 of 14 BPS YZ101B IOM-R1.0                                            © 2018 - Best Purging Systems Corporation